Regional Wastewater Treatment Plant Feasibility Study

> Industrial & Manufacturing
> Pharmaceutical & Biotechnology
> Municipal & State
> Federal
> Higher Education & Healthcare
> Developers & Professional Services
Regional Wastewater Treatment Plant Feasibility Study



Regional Wastewater Treatment Plant Feasibility Study
Confidential Client, North Carolina


Services: Feasibility Study

Schedule: 4 Months

Budget: $83,000 


Tasks:    

  • Feasibility Study
  • Basis-of-Design
  • Regulatory Assessment
  • Life-cycle Cost Analysis
  • Conceptual Design
  • Cost and Schedule Estimate    

Project Highlights:  
  • Performed a feasibility study to evaluate the economic and technical feasibility of constructing a new wastewater treatment plant (WWTP)
  • Projected organic and nutrient loading rates (and loading rate variability) for start-up and out-year conditions for existing and prospective pharmaceutical process waste streams
  • Assessed commercially available and proprietary technologies to pretreat industrial process wastewater and performed life-cycle optimization analysis for each
  • Developed conceptual design and regulatory framework for the new regional WWTP
  • Developed conceptual estimates for the design, construction, and operational costs for the new regional WWTP
  • Developed permitting, design, construction, and financing strategies to facilitate WWTP start-up
  • Conducted rate structure analysis for the two existing pharmaceutical industries and anticipated new pharmaceutical users
  • Prepared ownership and financing plan based upon public financing and ownership, and prepared alternative plan based upon private financing and ownership