Ventilation System Improvements

> Industrial & Manufacturing
> Pharmaceutical & Biotechnology
> Municipal & State
> Federal
> Higher Education & Healthcare
> Developers & Professional Services
Ventilation System Improvements



Ventilation System Improvements
Confidential Client, Georgia


Services: Study

Schedule: 8 Months

Budget: $17,000 


Tasks:  

  • System Improvement Assessments
  • Conceptual and Preliminary Design
  • Construction Management  

Project Highlights:  
  • Completed an assessment of potential improvements to the freezer room ventilation system to eliminate potential human health hazards
  • Evaluated the potential replacement of the ventilation system to provide varying ventilation to the space in response to changes in oxygen content
  • Evaluated the applicability of a point of source exhaust collection system to provide improved nitrogen gas capture
  • Evaluated alternative control approaches to monitor the oxygen content in the room, control the ventilation system, and annunciate alarm conditions
  • Developed methods to collect the freezer nitrogen vent cycle exhaust in conjunction with the other proposed ventilation system modifications
  • Developed a method to rapidly ventilate the room if the oxygen level reaches an established alarm level
  • Evaluated potential engineering solutions, and developed and summarized a short list of potential alternatives in a design alternative memorandum
  • Developed sketches of the conceptual arrangements, details, and costs
  • Prepared detailed engineering documents of the proposed ventilation improvements
  • Provided support during the construction phase 


Back to Project listing




Copyright ©2005-2008 O'Brien & Gere |
obg remote | e-mail: info@obg.com


Copyright ©2005-2008 O'Brien & Gere |
obg remote| e-mail: info@obg.com