Storm Water Basin Replacement

> Industrial & Manufacturing
> Pharmaceutical & Biotechnology
> Municipal & State
> Federal
> Higher Education & Healthcare
> Developers & Professional Services
Storm Water Basin Replacement



Storm Water Basin Replacement
Confidential Client, North Carolina 


Services: Design/Build

Schedule: 18 Months

Budget: $214,000


Tasks:   

  • Storm Water Pollution Prevention Plan
  • Regulatory Evaluation
  • Permitting
  • Modeling
  • Design
  • Construction
  • Commissioning  

Project Highlights:  
  • Developed a Storm Water Pollution Plan which identified a breached storm water retention basin
  • Evaluated regulatory requirements and secured appropriate permits for the replacement of the basin, including Army Corp of Engineers Nationwide Part 3 Permit and State Dam Permit requirements
  • Designed and constructed a cast-in-place concrete weir structure with adjustable stop logs, gentle side slopes, and riprap-lined open channel to minimize soil erosion from a 100-year storm event
  • Designed auxiliary infrastructure including a new access road and storage building 

Back to Project listing




Copyright ©2005-2008 O'Brien & Gere |
obg remote | e-mail: info@obg.com


Copyright ©2005-2008 O'Brien & Gere |
obg remote| e-mail: info@obg.com