Treatment Process at a Glance

  
Treatment Process at a Glance

Raw water screening

Two travelling screens, “fish- friendly” design

7’-8” wide each

Raw water pumping

Two 150-HP pumps (7.5 MGD each)

Two 250-HP pumps (10 MGD each)

Rapid mixing

One 2-stage basin

Detention time – 34 seconds

Flocculation

Three 4-stage basins

Detention time – 30 minutes

Clarification

Three basins equipped with stainless steel inclined plates

Chain and flight sludge collection

Filtration

Ten gravity filters
(Six existing/rebuilt, four new)

595 square feet each

12” sand and 31” GAC filter media

Waste handling

Five freeze-dry beds, 4.9 acres total plan area

Two backwash waste lagoons (existing)

Chemical treatment systems

Chlorine dioxide
(oxidant, preliminary disinfection)

Sulfuric acid (raw water pH adjustment)

Aluminum sulfate (primary coagulant)

Polymers (coagulant aid and filter aid)

Sodium hydroxide
(filtered water pH adjustment, corrosion control)

Chlorine 
(primary and residual disinfection)

PROJECT FACTS

Service connections
. . . . . . . . . . . . . 23,400

Population served . . . . . . . . . . . . . . .78,500

Total project cost . . . . . . . . . . . . . . . $24.22 million

Sources of supply . . . . . . . . . . . . . . . .Mohawk River

                          . . . . . . . . . . . . . . . .Stony Creek Reservoir

                          . . . . . . . . . . . . . . . .Mohawk View Well Field

Plant capacity . . . . . . . . . . . . . . . . . .30 million gal/day (40 million gal/day future)




Copyright ©2005-2008 O'Brien & Gere |