|
|
 |
Ventilation System Improvements Confidential Client, Georgia
Schedule: 8 Months
Budget: $17,000
Services: Study
Tasks:
- System Improvement Assessments
- Conceptual and Preliminary Design
- Construction Management
Project Highlights:
- Completed an assessment of potential improvements to the freezer room ventilation system to eliminate potential human health hazards
- Evaluated the potential replacement of the ventilation system to provide varying ventilation to the space in response to changes in oxygen content
- Evaluated the applicability of a point of source exhaust collection system to provide improved nitrogen gas capture
- Evaluated alternative control approaches to monitor the oxygen content in the room, control the ventilation system, and annunciate alarm conditions
- Developed methods to collect the freezer nitrogen vent cycle exhaust in conjunction with the other proposed ventilation system modifications
- Developed a method to rapidly ventilate the room if the oxygen level reaches an established alarm level
- Evaluated potential engineering solutions, and developed and summarized a short list of potential alternatives in a design alternative memorandum
- Developed sketches of the conceptual arrangements, details, and costs
- Prepared detailed engineering documents of the proposed ventilation improvements
- Provided support during the construction phase
|