Soil, Ground Water, and Lagoon Remediation Automotive Components Manufacturer, Plainville, Connecticut Services:
- Site Investigation and Remediation
- Remedial Plan Development
- Consent Order Agreement Execution
- Site Certification Report Generation
- Economics Analysis
Schedule: 3 Years
Budget: $12 Million
Tasks:
- Investigated environmental contamination at former manufacturing facility
- Prepared site investigation report summarizing results of completed investigations
- Identified potential remedial alternatives
- Designed and installed system to recover free-floating product on ground water table
- Developed remedial plan report evaluating remedial alternatives
- Provided recommended remedial site plan
- Addressed remediation of lagoon sludges, soils, ground water, and free-floating product
- Facilitated remedial activities
- Removed and treated 4 MG of lagoon top water
- Removed 145,000 gal of sludge to be used for off-site fuel blending
- Excavated and treated over 70,000 tons of soil by low-temperature thermal treatment (LTTT)
- Prepared site certification report documenting results of remedial activities
- Performed soil, lagoon sludge, and ground water field investigations
- Installed four product recovery wells to recover free-floating product
- Performed bench-scale treatability tests on soils and lagoon sludges
- Negotiated and developed consent order on behalf of client
- Developed site operations plan identifying strategy, means, and methods to implement remediation of sludges and soils
- Proposed cleanup verification sampling and analytical program
- Detailed long-term monitoring and operations and maintenance activities
- Performed lagoon water removal and sludge remediation
- Designed, installed, and operated Low Temperature Thermal Treatment system
Project Highlights:
- Development of a remedial plan for a 1.7-acre former waste oil lagoon
- Excavation, thermal treatment, and backfill of approximately 70,000 tons of affected soil
- Total turn-key remedial investigation, design, and remediation services
- On-site thermal treatment of 70,000 tons of petroleum contaminated soils
- Dewatering of 1.7 acre lagoon
- On-site screening/ processing of 145,000 gallons of petroleum contaminated sludges. Process sludges transported to off-site fuel blending facility
Brownfields site redevelopment for reuse