Wyeth Holdings Corporation, Bound Brook Remedial Program



Wyeth Holdings Corporation, Bound Brook Remedial Program 
Former Chemical Manufacturing Facility, Bound Brook, New Jersey 


Services:     

  • Environmental Studies
  • Chemical Sampling and Analysis
  • Preliminary Assessment
  • Mitigation/Ecosystem Restoration
  • Technical Reports

Schedule: 1982 - Present

Budget: $100 Million


Tasks:  
  • Section 404 Permit Evaluations
  • Biological Assessments of Fish and Wildlife
  • Environmental Restoration Planning and Design, Cost Effectiveness and Incremental Cost Analyses
  • Public Presentations
  • Bioassays Testing
  • TCLP Testing
  • Bulk Sediment Testing
  • Familiarity with Drinking Water Requirements
  • Site Specific Health and Safety Plans
  • Chemical Data Acquisition Plans
  • Review of Existing Project Material and Literature
  • Site Visits
  • Coordination with Federal, state, and local agencies
  • Review of historic records and maps and aerial photographs and databases relative to hazardous waste sites and hazardous spills
  • Preliminary Surveys
  • Agency Coordination
  • Wetland Design Assistance
  • Endangered Species Surveys
  • Population Studies
  • Habitat Evaluation
  • Site Mapping (Utilizing GIS)  

Project Highlights:  
  • Blending of contents from two lagoons into usable mixture for incineration off-site as fuel
  • Design of pumping system to pump 3 MG of viscous, organic tar sludge into trucks for off-site disposal air emission control system to minimize volatile emissions
  • Design of on-site wastewater treatment system for oil-water separation, neutralization, and carbon treatment
  • Solidification-stabilization of remaining lagoon sludge
  • Encapsulation of lagoons following removal of aqueous layer
  • Design review, modifications, construction, and construction oversight of a one million yd3 RCRA on-site hazardous waste facility
  • Built in four cells, serving as a disposal site for dewatered, excavated, and treated lagoon materials
  • Utilization of stabilized material for internal berm of landfill cell, resulting in a $500,000 cost savings  