Remedial Design Former Stauffer Chemical Facility, Tarpon Springs, FL (Federal Superfund Site)
Services:
- Pre-design
- Remedial Design
- Study
Schedule: 1999 - Present
Budget: $6.0 Million
Tasks:
- Pre-design Investigation
- Geophysical Studies
- Treatability Testing
- Radiological Screening
- Ecological Studies
- Design Documents
Project Highlights:
- Performed extensive geophysical studies to evaluate the possible presence of limestone karst features, and to verify that the site can support the mound and cap remedy
- Performed bench and field scale pilot studies to evaluate appropriate mix designs for stabilization of pond materials and underlying soils 3 of material